Landfill Mining
Landfill mining involves excavating active or closed landfills to reduce their environmental impact. Depending on the landfill location, Metals (FE & Non Fe), RDF & Landfill engineering products can be recovered.
Let's find YOUR solution
3 options
Static
Our static systems are custom designed and built to YOUR requirements #recyclingmadeeasy.
Get startedModular
M&K Modular systems offer the unparalleled performance of static systems with the convenience & flexibility of mobiles. #recyclingmadeeasy.
View optionsLandfill Mining
- Excavated material from a landfill is presorted/shredded
- Trommel Screen (TS620T.HD) sizes presorted excavated material
- +200mm fraction transfers to a Picking Station with Air Separator (PS312M)- RDF, Fe, Non Fe are recovered.
- -200mm undersize transfers to Recycling Screens with Flip Flow Deck (RS514T), Air Density Separator (AS150T) & Eddy Current Separators (EC315T)
- 0-20mm recovered. 0-20mm fe recovered
- 20-60mm fe recovered. 20-60 mm non-fe recovered. 20-60mm RDF recovered.
- 60-200mm fe recovered. 60-200 min non-fe recovered. 60-200mm RDF recovered.
M&K can supply full turnkey solution